Mula Riverfront Pavilion

A shaded public deck on the Mula riverbank, built above the flood line and designed to be under water once a decade without being damaged.

The Mula Riverfront Pavilion seen from the water in late afternoon, the raised deck and its folded steel canopy standing clear above the riverbank on concrete piers
Year
2025
Location
Aundh, Pune
Area
1,150 m²
Typology
Public
Status
Built
Client
Neighbourhood residents' association

01 / THE BRIEF

What the client needed, and what the site imposed.

A residents' association had raised funds over four years for a shaded gathering place on a neglected stretch of the Mula riverbank — somewhere to sit in the evening, hold a weekly market, and let children get down to the water safely. The budget was modest and entirely donated, which shaped everything: there was no contingency to speak of, and any overrun would have stopped the work.

The governing constraint is the flood line. The site is inside the blue line and the lower two-thirds of it go under in a bad year. Anything we built at ground level would be silted, scoured or removed. That single fact turned what the association imagined as a garden with a roof into a raised platform on piers with everything below it designed to be temporarily submerged.

02 / DESIGN APPROACH

The building is a deck at +3.400, held on twelve concrete piers, with a lightweight steel canopy above it. Underneath is left open and paved in loose-laid stone, so floodwater passes through and the silt can simply be swept out afterwards. Nothing structural, electrical or finished sits below the flood level. The only fixed thing down there is the stair, cast in the same concrete as the piers.

The canopy is where the money went and where it should have. It is a steel frame carrying a folded mild-steel deck, 4.2 metres above the platform, sized so that the shadow it casts covers the whole deck between ten in the morning and four in the afternoon — which is the calculation that mattered, and one you can only make in section. Cross Section BB shows it: the height of the canopy, the depth of the overhang, and the sun angles marked at the equinox.

Everything else is deliberately cheap and replaceable. The deck boards are local hardwood on a steel sub-frame, screwed rather than glued so a damaged board can be swapped by anyone with a driver. The balustrade is welded flat bar. Three years in, the association has already replaced eleven boards and repainted the balustrade once, both without us. That is the outcome we wanted: a public building the people who paid for it can maintain themselves.

03 / SITE & CONTEXT

The relationship between the building and what surrounds it — the part a photograph structurally cannot show.

04 / DRAWING SET

08 SHEETS

Every sheet opens at a size where it can be read

Site Plan

01 SHEET

Floor Plan

02 SHEETS

Section

02 SHEETS

Elevation

01 SHEET

Detail

01 SHEET

Axonometric

01 SHEET

05 / PHOTOGRAPHY

04 PLATES
  • PL 01Seen from the riverbed in March, at low water.
  • PL 02The folded canopy from below.
  • PL 03Thursday market. The deck takes about forty stalls.
  • PL 04Screwed, not glued — so a board can be changed in a morning.

06 / CREDITS

No building is the work of one office. Crediting consultants, contractors and photographers properly is standard professional practice, and its absence is conspicuous.

Design Team
Aditi Raikar, Sanya Qureshi
Project Architect
Sanya Qureshi
Structural Consultant
Vaidya & Rao Consulting Engineers
MEP Consultant
Prabhu Building Services
Landscape
In-house, with the association's planting group
Contractor
Ashray Builders
Photography
Ira Sen